What your team is building
A tourism product designed, costed, marketed and piloted for a real destination — policy, economics, heritage, law, influencer marketing.
Your block's convener. Asma Khalid.
You submit one piece of work, and each course that marks it looks at a different dimension, out of 15. At most eight courses mark one team file. A course you take that falls outside those eight sets you a lens note instead — an individual piece on the same project from that course's angle, 3,000 words, same rubric, out of 15, with a viva out of 5. No student carries more than two: from a third, that course marks your viva out of 20 instead.
30 sessional work — a team mark of 15 from each course that marks your file, plus your own viva of 5, held in class in the Presentations & Viva week, plus your teacher's quizzes and assignments 10
30 the mid-term
40 the final
This replaces most coursework, not classes.
The projects in this block
Your team chooses one of these in session 6, with your convener. At most two teams take the same project, and only on different sites or areas. The full question, the work and the required pieces for each project are in the Ideas Book. Each line below says what your team leaves behind by December, and the skill you take away.
| Project | What exists by December | Skill |
|---|---|---|
| Saddar Heritage WalkReports to: Sindh Culture, Tourism & Antiquities Dept | A researched, costed Saddar walking route, piloted on four Sunday mornings, with report offered to Sindh Culture and Tourism Department. | designing, costing and leading a guided tour |
| The Karachi Sea WeekendReports to: Sindh Tourism Development Corporation | A costed two-day coastal itinerary with operator and visitor interview findings, and a daylight day-trip if one runs, offered to Sindh Tourism Development Corporation. | costing a tourism product |
| Student Travel to Sindh's SitesReports to: Sindh Culture, Tourism & Antiquities Dept | A costed student heritage tour plan, a 150-student demand and price survey and a signed-off risk plan, handed to the university and offered to Sindh Culture and Tourism Department. | planning a group trip with approvals and budget |
What each course marks
| Code | Course | What this course marks — 15 marks |
|---|---|---|
| GBTD446 | Sustainable Tourism Development & Policy Muhammad Wasay | This course marks the policy test: the stakeholder map and who was actually consulted, the environmental and social impact assessment, the carrying-capacity judgement, and the conditions, limits and monitoring plan attached to the proposal. 15 marks, team. |
| GBTE442 | Tourism Economics Dr. Arifa Saeed | This course marks the economics of the plan: the demand estimate and the evidence behind it, the cost and revenue model, the impact and leakage assessment, and whether the case survives questioning about who in the host area actually gains. 15 marks, team. |
| GBHT445 | Cultural & Heritage Toursim Asim Naseer | This course marks the heritage judgement: the accuracy and sourcing of the site account, the interpretation plan and who it speaks to, the visitor management and conservation constraints recognised, and the evidence that the community whose heritage it is was consulted and agreed. 15 marks, team. |
| GBLE555 | Tourism & Hospitality Laws & Ethics Muhammad Wasy | This course marks the legal and ethical position: the compliance register against the instruments that actually apply, where liability sits and how it is allocated by contract, the employment and consumer obligations identified, and the quality of the ethical reasoning where the law is silent. 15 marks, team. |
| GBMT562 | Social Media and Influencer Marketing in Tourism TEACHER TO BE NAMED | This course marks the campaign: the audience and platform choice and the evidence for it, the content produced and its fit to the destination, the creator selection and brief, the disclosure and ethical compliance of everything published, and the honesty of the results read. 15 marks, team. |
What to hand in
- GBTD446 Sustainable Tourism Development & Policy — By session 11 the policy annexe published on the team's hosted destination site — stakeholder map, impact assessment, carrying-capacity limits and a monitoring plan a provincial authority could act on — with AI declaration.
- GBTE442 Tourism Economics — By session 11 a hosted destination dashboard built with AI tools — demand estimate, costing model and impact figures a client can open in a browser — with the one-page plan and AI declaration filed alongside it.
- GBHT445 Cultural & Heritage Toursim — By session 11 a hosted digital site guide built with AI tools — sourced site account, interpretation panels, a visitor route and a conservation constraints map — with the written plan and AI declaration filed alongside it.
- GBLE555 Tourism & Hospitality Laws & Ethics — By session 11 a hosted compliance pack built with AI tools — permits and licences required, a liability map, a model booking-terms and cancellation clause set, and an ethics position note — with AI declaration filed alongside it.
- GBMT562 Social Media and Influencer Marketing in Tourism — By session 11 a live campaign — a hosted campaign microsite built with AI tools plus published content across the chosen platforms, running against a real budget — with the media plan, the results dashboard and AI declaration.
How big the file is
The written file is 3,000 words for every member, plus or minus ten per cent — 15,000 words for a team of five, 12,000 for four, 9,000 for three — plus the artefacts: the evidence or data log with its instrument, interview notes and consent log, any program with its tests, the pitch deck, the AI declaration, the draft-to-final revision log, the two-page brief for the body the project reports to, delivered by the team, and the handover page (data, methods, what next year's team should do). In the venture and client lanes the live thing itself is the largest artefact. Each member owns one section of 3,000 words with their name on it, one artefact they built, and one part they can defend alone at viva. A lens note is 3,000 words on the same project. The full format is in "The Folio — required format", in the portal.
Dates
Rules for this lane
What counts as done
A working deliverable in the client's hands, hosted where it needs to be hosted, with the files and accounts handed over and the client's written comment on record.
The client relationship
You get two meetings — one to take the brief, one to show progress — plus a short written comment at the end. Ask for no more. You never ask for a fee and never accept one. Where the work needs spending — printing, adverts, hosting, materials — the client pays it directly, or there is no spend: any paid activity is optional and client-funded, and the team spends nothing of its own.
Confidentiality
Whatever the client marks confidential stays inside the team and the supervisor. Never accept customer records, financial account details or personal data about identifiable people, and never put any of it into an AI tool.
If the client goes quiet
Tell your convener in the same week. Every client-lane block has an internal Greenwich brief as a fallback — the GX record, the alumni directory, Journey 40 and departmental systems all need building.
Marks
You are marked on the work, not on the client's mood. A difficult client, honestly handled and documented, is not a penalty.
Two teams to a project, at most
No project is taken by more than two teams, and two teams share one only on different sites or areas. Your convener records your choice in session 6 and may refuse a third team.
Before you leave campus
Whatever your lane: no team collects data before its ethics screen is cleared, and no team leaves campus before the fieldwork gate opens on Saturday 10 October, the duty phone exists and the team has signed out on the sign-out sheet. The duty number is on your field card.
Using AI
You are expected to use Claude and similar tools — to research, to build, to draft, to model numbers. Three rules. Check everything a tool gives you before you use it, and record the check. Declare what you used in the AI declaration bound into the file, as the HEC Framework on the Use of Generative AI Tools (2026) requires. Be able to explain, at the viva, everything your team built. Work you cannot explain is not credited to you. Undeclared use, or use to fabricate data, references or results, is academic misconduct. Never put real client, patient or examinee data, or anything identifying a real person, into a tool.
